Tuesday, 7 Apr 2026
Get Your Quote Now : Quotation
Carbon Steel Supporting Tube for Road Lamps.
1. OEM & ODM both accepted. Products can be designed and produced as per customer's requirements in forms of Samples, Drawings or even just a draft idea.
2. Over 20 years of experience in casting, welding, forging and precision machining for US, European and other overseas markets.
3. Leadtime (Negotiable) : - For toolings: around 15-35 days. - For samples: 7- 15 days. - For batch production: 25 days.
4. Payment terms (Negotiable): - For toolings: 100% pre-payment before development. - For samples: For free unless the sample(s) value is too big.- For mass production: 30% down payment before production (and after samples approval), balance 70% before delivery.
5. Package: Carton Box, PlyWood Box, Standard Export Pallets or as per customers’ requirements.6. Shipping terms: EXW, FOB, CFR, CIF, DDP, DDU...all could be accepted.
| Item | Specifications | Remarks |
|---|---|---|
| Update Date | Jinbalu Trading Co.Ltd | 2026 |
| Lead time | within 30 days | Can be expedited |
| Material | See product manual | Request Inspection Report |
| Application | Applicable to multiple industries | Complies with standards |
| Keywords | Carbon,Supporting,Hot-Rolled,Structural,Mounting,Lamps. | |
Carbon steel road lamp tubes must be hot-rolled (ASTM A500 Gr.B), galvanized per ASTM A123, and straightness-controlled (<1.5 mm/m). Avoid thin-wall sections in high-wind zones; confirm anchor bolt compatibility with foundation design to prevent structural failure. (for reference only)
Clients Reviews