IronAxis

IronAxis Industrial Supply

IronAxis is a U.S.-based B2B supplier of industrial equipment, instruments, machinery, food processing systems and new energy solutions for manufacturers, labs and engineering companies.

Contact Us

info@ironaxis-supply.com

More Services More Services More Services More Services More Services More Services
Orange Cake Mix 500 Gr - Roshd

Roshd Food Industries .Co

recipeNecessary materials: Eggs = 3 pcs ,Liquid oil = 100 grams (1/2 cup), milk or water = 150 grams (3/4 cup)Preparation method:- Turn on the gas oven and heat it to 180 degrees Celsius for 15 minutes...

Packaging & Filling Roshd Food Industries .Co 22 Dec 2025 ( )

Get Your Quote Now : Place of origin : Iran

recipe

Necessary materials: Eggs = 3 pcs ,Liquid oil = 100 grams (1/2 cup), milk or water = 150 grams (3/4 cup)

Preparation method:

- Turn on the gas oven and heat it to 180 degrees Celsius for 15 minutes.

- Break the eggs in a suitable container. Mix for 2 to 3 minutes with the mixer on high speed until puffed and lightened.

- Add milk, water, and oil to the eggs and mix for 1 minute with a medium stirring speed.

- Add the orange cake powder to the mixture little by little and mix it with the slow speed of the mixer for 1 to 1.5 minutes until it is uniform.

- Grease the mold’s inner surface with a small amount of oil and sprinkle a little flour on the bottom. You can put parchment paper on the bottom of the mold instead.

- Put the dough in the mold.

Place the mold in the middle of the oven for about 35 to 45 minutes, until the color is almost golden.

Practical tips:

- Use a mold in which the height of the dough is no more than 5 cm.

- Do not open the oven door for 15 minutes after putting the cake in the oven.

- To ensure that the cake is fully cooked, insert a toothpick into the center of the cake. If the dough does not stick to it, the cake is cooked.


- After removing the cake from the oven, let it cool in the mold for 15 minutes. then take it out of the mold.


Technical Specifications

Item Specifications Remarks
Update Date Roshd Food Industries .Co 2025
Lead time within 30 days Can be expedited
Material See product manual Request Inspection Report
Application Applicable to multiple industries Complies with standards
Keywords Orange,recipeNecessary,materials,Liquid,Preparation,method

Procurement suggestions

Clients Reviews

Leave A Reviews

Rating: ⭐⭐⭐⭐⭐ 5.0 (Based on 57 cumulative feedbacks)